This project is developing Australia’s first commercial-scale integrated waste-to-hydrogen facility, combining clean hydrogen production, upcycled manufacturing, and zero-emission energy solutions. Anchored by supply and offtake agreements and backed by grants and pilot studies, the facility converts landfill and biomass waste into low-cost hydrogen and high-value industrial products.
- Equity
- Projected revenue of AUD 25M by 2025, and AUD 220M by 2029
- Secured site lease, technology partners, and government recognition as “Essential Infrastructure”
- Phase 1 completed: site control, tech validation, supply/offtake MoUs, and financial modeling
- $425M eligible for R&D grants with 43% recovery rate
- Positioned to divert 20% of SA landfill and achieve net negative emissions by 2030
Problem: Rising landfill waste, greenhouse gas emissions, and expensive hydrogen production hamper Australia’s clean energy transition.
Solution: This facility will produce hydrogen for <$2/kg from waste, leveraging gasification, renewable power integration, and patented process design, reducing methane emissions and creating scalable clean energy manufacturing.
- Global hydrogen market to reach USD 410B by 2030
- South Australia lacks commercial hydrogen-scale processing hubs
- Facility targets energy, agriculture (urea), transport, and grid supply sectors
- Aligns with national hydrogen export strategies and landfill diversion policies
- Fully integrated model from waste intake to product delivery
- National and international licensing pathway using flagship plant as proof
- Strategic offtake and supply chain partners in agri, soil, and energy sectors
- Strong R&D partner support (University validation) and pre-pilot trials in Europe
- IP and patent development in progress
- Gasification testing validated with Australian university
- Reconditioned 100MW CCGT power plant sourced
- 3-phase rollout plan underway with Phase 1 completed
- Received Crown sponsorship by State Government
- Secured early partnerships with agriculture, soil, and waste companies
- Ungeared IRR forecast: up to 30%
Early-stage strategic investors will receive co-development visibility, licensing expansion opportunities, and potential participation in pilot-scale rollout.
- English
Targeted IPO or trade sale at the commencement of revenue (estimated 2026). Longer-term growth optionality beyond 2029 with expanded licensing and multi-site replication.
- Level 1 - Basic Info Submitted
- Level 2 - Profile Verified
- Level 0 – Auto Translation Only (via floating button)
- Level 1 – Summary Human Translated
We’ll forward your request to the project owner and support your next step.
